Control site
Confirm the route, network role and required interface at this stage.
Communications plus auxiliary services
Utility projects frequently have non-standard interfaces and mechanical duties. The optical path, copper elements, route exposure and system voltage or signalling requirement must be reviewed together before construction is fixed.
Network path
The cable role changes along the network. Use the complete path to define capacity, protection and installation duty.
Confirm the route, network role and required interface at this stage.
Confirm the route, network role and required interface at this stage.
Confirm the route, network role and required interface at this stage.
Confirm the route, network role and required interface at this stage.
Design priorities
Define every optical and copper function, conductor requirement and termination interface.
Confirm aerial, duct, buried or exposed sections together with the required protection.
Agree the construction, test schedule and acceptance criteria in the customer-approved TDS.
Suitable starting families
These families are practical starting points, not automatic final selections. The approved project TDS determines the supplied construction.

Combined optical and copper connectivity
Fibre range
4 fibres + 5 copper pairs

Self-supporting aerial networks
Fibre range
Up to 144 fibres

Direct-buried and duct networks
Fibre range
Up to 144 fibres

Harsh-environment, military and rapid-deployment routes
Fibre range
Up to 8 fibres
Prepare the review
Providing the route and performance basis early makes product selection, TDS preparation and commercial review more accurate.
Optical and copper service definition
Conductor and fibre requirements
Route and support method
Electrical and environmental constraints
Interface and termination details
Project test and approval criteria