OFS Cables
Aerial cables

All-Dielectric Self-Supporting Cable

Self-supporting aerial networks

All-Dielectric Self-Supporting Cable product construction

Application

Self-supporting aerial networks

Available range

Up to 144 fibres

Supply basis

Approved customer TDS

Construction overview

Designed from the route requirement outward.

All-dielectric SZ-stranded cable with FRP central member and aramid-yarn peripheral strength.

This product is a configurable cable platform. Fibre type, materials, reinforcement, marking and packaging can be adapted where the selected construction and applicable standards permit.

Selection guidance

Is this the right starting point?

Choose this family when

  • The cable must be self-supporting between poles
  • A fully dielectric aerial construction is required
  • The route runs in an electrical or lightning-sensitive environment

Confirm before design

  • Span, sag and pole geometry
  • Wind, temperature and project loading
  • Line voltage, hardware and installation tension

Representative specifications

Project-specific values confirmed by OFS Engineering.

This product family is available for project review. Dimensions, weight and guaranteed mechanical performance are issued only in the approved project TDS after the route and construction are confirmed.

Controlled technical data

Send the installation environment, fibre count, span or route duty and applicable standard. OFS will return the controlled specification for approval.

Request the product TDS

Controlled specification

The approved TDS controls every order.

Online information supports selection. Before production, OFS converts the route, performance and commercial requirement into a formal construction for customer approval.

01

Requirement

Route, fibre count, environment and standards

02

Design

Materials, dimensions and performance review

03

Approval

Customer-approved Technical Data Sheet

04

Production

Manufacturing, tests and dispatch records

Compare alternatives

Related cable families.

Review adjacent constructions before finalising the design basis.