Core site
Confirm the route, network role and required interface at this stage.
National, regional & metro transport
Backbone design begins with route protection, fibre capacity and restoration strategy. OFS can configure duct or armoured constructions around the installation method, mechanical duty and approved network standard.
Network path
The cable role changes along the network. Use the complete path to define capacity, protection and installation duty.
Confirm the route, network role and required interface at this stage.
Confirm the route, network role and required interface at this stage.
Confirm the route, network role and required interface at this stage.
Confirm the route, network role and required interface at this stage.
Design priorities
Allow for the commissioned fibre count, dark-fibre allocation and practical network growth.
Match armour, sheath system and water blocking to duct, trench and ground conditions.
Confirm pulling length, drum plan, joint locations, bend limits and installation tension.
Suitable starting families
These families are practical starting points, not automatic final selections. The approved project TDS determines the supplied construction.

High-capacity duct networks
Fibre range
Up to 144 fibres

Direct-buried and duct networks
Fibre range
Up to 144 fibres

Severe direct-buried and duct environments
Fibre range
Up to 144 fibres

High-density duct and backbone networks
Fibre range
Up to 144 fibres
Prepare the review
Providing the route and performance basis early makes product selection, TDS preparation and commercial review more accurate.
Route survey and installation method
Required fibre count and fibre type
Maximum drum and pulling section
Mechanical and environmental standard
Duct, soil and water conditions
Testing and documentation requirement