Telecom backbone networks

Backbone design begins with route protection, fibre capacity and restoration strategy. OFS can configure duct or armoured constructions around the installation method, mechanical duty and approved network standard.

Network path

Design each section as part of the whole.

The cable role changes along the network. Use the complete path to define capacity, protection and installation duty.

1

Core site

Confirm the route, network role and required interface at this stage.

2

Long-haul route

Confirm the route, network role and required interface at this stage.

3

Regional node

Confirm the route, network role and required interface at this stage.

4

Metro ring

Confirm the route, network role and required interface at this stage.

Design priorities

Decisions that shape the cable.

01

Capacity planning

Allow for the commissioned fibre count, dark-fibre allocation and practical network growth.

02

Route protection

Match armour, sheath system and water blocking to duct, trench and ground conditions.

03

Section engineering

Confirm pulling length, drum plan, joint locations, bend limits and installation tension.

Prepare the review

Information OFS Engineering needs.

Providing the route and performance basis early makes product selection, TDS preparation and commercial review more accurate.

Route survey and installation method

Required fibre count and fibre type

Maximum drum and pulling section

Mechanical and environmental standard

Duct, soil and water conditions

Testing and documentation requirement