PoP
Confirm the route, network role and required interface at this stage.
Aggregation, distribution & access
Metro networks often combine existing ducts, short buried sections and frequent access points. Selection should balance compact diameter, fibre capacity, handling and the protection required along each route segment.
Network path
The cable role changes along the network. Use the complete path to define capacity, protection and installation duty.
Confirm the route, network role and required interface at this stage.
Confirm the route, network role and required interface at this stage.
Confirm the route, network role and required interface at this stage.
Confirm the route, network role and required interface at this stage.
Design priorities
Match cable diameter and installation method to duct occupancy and route congestion.
Plan branch points, closures, spare capacity and the fibre allocation used at each node.
Identify sections needing armour or additional sheath protection before final design.
Suitable starting families
These families are practical starting points, not automatic final selections. The approved project TDS determines the supplied construction.

Duct, pulled or blown installations
Fibre range
2–12 fibres

High-capacity duct networks
Fibre range
Up to 144 fibres

Duct routes exposed to mechanical load or rodent risk
Fibre range
Up to 12 fibres

Direct-buried and duct networks
Fibre range
Up to 144 fibres
Prepare the review
Providing the route and performance basis early makes product selection, TDS preparation and commercial review more accurate.
PoP and node locations
Duct size and occupancy
Fibre-count plan
Pulling or blowing method
Armour and rodent-protection need
Required cable and fibre standards