Feeder
Confirm the route, network role and required interface at this stage.
Feeder to subscriber connection
A useful FTTH solution treats feeder, distribution and drop as one system. OFS helps select compatible cable families for each section while accounting for installation environment, fibre allocation and building entry.
Network path
The cable role changes along the network. Use the complete path to define capacity, protection and installation duty.
Confirm the route, network role and required interface at this stage.
Confirm the route, network role and required interface at this stage.
Confirm the route, network role and required interface at this stage.
Confirm the route, network role and required interface at this stage.
Design priorities
Define feeder and distribution capacity around the planned architecture and take-up model.
Confirm whether the drop is aerial, ducted, façade-mounted or taken directly into the building.
Select the appropriate sheath, bend performance and support construction for the final section.
Suitable starting families
These families are practical starting points, not automatic final selections. The approved project TDS determines the supplied construction.

High-capacity duct networks
Fibre range
Up to 144 fibres

Duct, pulled or blown installations
Fibre range
2–12 fibres

Last-mile fibre and building entry
Fibre range
1–6 fibres

Aerial distribution routes
Fibre range
Up to 144 fibres
Prepare the review
Providing the route and performance basis early makes product selection, TDS preparation and commercial review more accurate.
Feeder and distribution fibre counts
Aerial or underground route split
Drop length and support method
Indoor and outdoor sheath requirement
Fibre type and bend-performance need
Drum, coil and marking requirement