Main facility
Confirm the route, network role and required interface at this stage.
Buildings, campuses & temporary links
Enterprise routes can move between ducts, outdoor trays, exposed sections and building entries. OFS can configure a cable family around the pathway, handling frequency and required environmental protection.
Network path
The cable role changes along the network. Use the complete path to define capacity, protection and installation duty.
Confirm the route, network role and required interface at this stage.
Confirm the route, network role and required interface at this stage.
Confirm the route, network role and required interface at this stage.
Confirm the route, network role and required interface at this stage.
Design priorities
Identify where the cable changes between outdoor, buried, exposed and indoor environments.
Separate fixed infrastructure from temporary or repeatedly deployed cable requirements.
Review impact, crush, moisture, chemical exposure and any project-specific sheath requirement.
Suitable starting families
These families are practical starting points, not automatic final selections. The approved project TDS determines the supplied construction.

Duct, pulled or blown installations
Fibre range
2–12 fibres

Duct routes exposed to mechanical load or rodent risk
Fibre range
Up to 12 fibres

Temporary, rapid and harsh-environment distribution
Fibre range
2–12 fibres

Harsh-environment, military and rapid-deployment routes
Fibre range
Up to 8 fibres
Prepare the review
Providing the route and performance basis early makes product selection, TDS preparation and commercial review more accurate.
Site and pathway plan
Permanent or repeated deployment
Indoor/outdoor route transitions
Fibre count and connector strategy
Mechanical and environmental exposure
Fire-performance requirement where applicable